Nos services /
Closing the deal
Intent of cooperationBoth parties sign a letter of intent for cooperation, and the buyer shall pay approximately 5-30% of the amount as the cost of detailed design drawings and needed equipment.
The seller is responsible for production, regularly reporting production progress, notifying the buyer two weeks before shipment, and arranging pre shipment inspection (if the buyer needs to conduct third-party inspection, such as SGS inspection, the cost will be calculated separately)